They want drywall on the existing studs but that moves into the poured wall section.
Glue drywall to interior concrete wall.
If the drywall is in contact with the concrete it is vulnerable.
While you can certainly glue drywall to a concrete block wall there are significant disadvantages with this method of adhering it.
Small dollops of hot glue.
The concrete stairsteps from front to back where the back is all studs and no poured concrete.
Cut the nozzle end of a tube of construction adhesive at a 45 degree angle using a utility knife.
You can use standard 2 x 4 boards and strong adhesive to create a wooden framework to which you can easily attach your paneling.
Frame out the rest of the wall by adding faux top and sole plates dropping the top a bit for a drop ceiling if.
An alternative to gluing your paneling directly to the walls is to glue wooden studs to the walls and then attach the paneling to the studs.
The basement has poured concrete walls in combination with 2x6 plates and studs.
Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make.
Using a scraper scrape off chunks of debris from the wall to make it as smooth as possible.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
This protects the panel from wicking moisture or water from the floor.
I have drywalled many.
Cut wood panels 3 4 inch shorter than the wall s height to hold the bottom edge off the floor.